Fant denne hos FlightGlobal:
http://www.flightglobal.com/article...t-dc-8s-tailstrike-influenced-afghan-ban.html
Og disse to godbitene for de som lurer på hvor lite grundig man kan være:
-A
http://www.flightglobal.com/article...t-dc-8s-tailstrike-influenced-afghan-ban.html
Slack operational oversight allowed an Afghan McDonnell Douglas DC-8-63 freighter to take off from a UK runway while nearly 12t above weight limits, resulting in its overrunning and striking its tail.
Og disse to godbitene for de som lurer på hvor lite grundig man kan være:
None of the three crew members had operated a DC-8 for eight months. They had not been interviewed for their post or gone through a selection process, and the operator had not required further training or checks before releasing them to line operations.
The DC-8's tail skid scored a 117m-long mark before the jet became airborne.
-A