Her der planene, kilde:NASA
Datoene kan endres.
Launch Target:
April 19, 2011
Orbiter:
Endeavour
Mission Number:
STS-134
(134th space shuttle flight)
Launch Window:
10 minutes
Launch Pad:
39A
Mission Duration:
14 days
Spacewalks:
4
Landing Site:
KSC
Inclination/Altitude:
51.6 degrees/122 nautical miles
Primary Payload:
36th station flight (ULF6), EXPRESS Logistics Carrier 3 (ELC3), Alpha Magnetic Spectrometer (AMS)
--------------------------------------------------------
Launch Target:
June 28, 2011
Orbiter:
Atlantis
Mission Number:
STS-135
(135th space shuttle flight)
Launch Window:
10 minutes
Launch Pad:
39A
Mission Duration:
12 days
Spacewalks:
1 (by ISS crew)
Landing Site:
KSC
Inclination/Altitude:
51.6 degrees/122 nautical miles
Primary Payload:
37th station flight (ULF7), multi-purpose logistics module